USD 435 School Enhancement Plan

Curriculum Area: Math

Goal:  Implement the McDougal Littell resources to the fullest potential

 

 

Long Term Goal - Apply strategies involving accommodations and modifications to increase the learning of all students, particularly low SES and Special Education students.

6-8

Schoolwide Initiative

 

Short Term Goal Ð Apply appropriate measurements and measurement formulas to solve real-world problems.

6-8

Grade Level or Content Area Initiative

 

Steps to Achieve Goal                                                                                                            Timeline                     Person in charge

Student use of www.classzone.com in the classroom

 

6-8 Math instructors

Encourage use of www.classzone.com at home

 

6-8 Math instructors

Notetaking Guide used by students and teachers

 

6-8 Math instructors

Learning Station website tools

 

STAR and 6-8 instr.

KCA Formative Test information

 

6-8 Math instructors

ACE Conditioning Exercises

 

6-8 Math instructors

Math enrichment groups based on MAPS testing

 

STAR and 6-8 instr

 

 

 

                                                                       

Data to show we achieved the goal (at least two forms of data required)                             Baseline                      Results

Maps Fall 2006 Testing

223.1 norm mean

226.4 AMS mean

 

Maps Spring 2007 Testing

 

 

State Assessment

Spring 2006 67.7% proficient or above

 

(Results should be recorded at the end of the term identified above and sent to the local School Enhancement Chair for posting.  If additional documentation is needed please attach)

 

Staff Development Needed                                                                                                     Possible Location       Expected Costs

McDougal-Littell representative question/answer session

Abilene

0 (in package)

State Math Conference

KS

$300

Smoky Hill

Salina

$200

 

Resources Needed                                                                                                                   Where                         Expected Costs

Time (summer) 3-4 days for 3 staff members

Central Office

$1500.00

 

 

 

 

 

 

 

 

 

 

 

Notes:

1)    Possible data sources can include assessment scores from MAP or State assessments, locally developed assessments that will show the change, locally developed Rubrics to show implementation and change, portfolios, focus groups, observation toolsÉ..

2)    When goals are completed it doesnÕt necessarily mean they are dropped.  They should be engrained in instruction that it no longer needs to be a goal for implementation to occur.